When I drag a task in between two calendar items in a list, the due date for the task is based on the start time of the item below where the task is dragged. E.g. when I drag a task between an item that has 1pm-1:30pm as start/end times and one that is 2pm-3pm, the dragged task starts at 2pm
Is there a setting to base it instead on the end time of the task above? So that in this example the task due date would be 1:30pm.