Hello,
I have two tasks. Task 1 and task 2.
I want task1 to be the subtask of task2.
I drag task1 onto task2.
Task 1 shows as a subtask of task 2.
And also shows as a normal task.
So task 1 shows in two places.
And now I have to manually delete normal task 1 at the root.
Why would this happen? Is there some explanation around this?